Project Title: Lamerd Gas Condensate Refinery
Project Code: 3-066
Client: Lamerd Refinery Company
Location: Lamerd, Fars Province, IRAN
Contract Type: Managing Contractor (MC)
Start Date: 13 September 2005
Project Duration: 6 months
Status: Accomplished
Project Aspects:
The plant consists of:
-
Condensate Distillation Unit (CDU)
-
Naphtha Hydrotreating Unit (NHU)
-
Naphtha Splitter Unit (NSU)
-
Light Naphtha Isomerization Unit (ISOM)
-
Continuous Catalytic Reformer Unit (CCR)
-
Kerosene Treating Unit (KTU)
-
Diesel Hydrotreating Unit (DHU)
-
Gas Sweetening And Sulphur Recovery Unit
-
Related utility units
-
Related off-site units
Project Description:
The NIOC permit of NIOC is the main concern of establishment of new LPG condensate facilities with following specification:
-
Feed Source of Supply: Assaluyeh region in South Pars gas field of overseas country.
-
Transport facility: Pipe line
-
Intake/Off take facilities: Assaluyeh facilities including loading/unloading
-
Main Product: Kerosene, gasoline, gasoil, jet fuel, naphta
-
Capacity: 120,000 BBLD.
-
Feed Specification: LPG condensate from South Pars gas field
ANEDCO Scope of Work:
-
Pre-Feasibility Study
-
Managing Contracting including coordination of access road study, Environmental Impact Assessment, Water, environmental, and climate conditions, geotechnical study, earthquake study, geology, surveying,
-
HSE
-
Feasibility Study
-
License
-
Basic Engineering Design
-
Detail Engineering including: Detail Procurement, Delivery to site.
-
Construction
-
Pre-Commissioning
-
Start-Up
-
Operation including: Market, Laboratory, Mechanical, Process, Inspector, Production, Planning, Administration
-
Whole Basic and Detail Engineering Design (in separated contracts)
-
MR Preparation
-
Vendor Documents Checking
-
Site Supervision