Project Title: Lamerd Gas Condensate Refinery
Project Code: 3-066
Client: Lamerd Refinery Company
Location: Lamerd, Fars Province, IRAN
Contract Type: Managing Contractor (MC)
Start Date: 13 September 2005
Project Duration: 6 months
Status: Accomplished

Project Aspects:

The plant consists of:

  • Condensate Distillation Unit (CDU)
  • Naphtha Hydrotreating Unit (NHU)
  • Naphtha Splitter Unit (NSU)
  • Light Naphtha Isomerization Unit (ISOM)
  • Continuous Catalytic Reformer Unit (CCR)
  • Kerosene Treating Unit (KTU)
  • Diesel Hydrotreating Unit (DHU)
  • Gas Sweetening And Sulphur Recovery Unit
  • Related utility units
  • Related off-site units

Project Description:

The NIOC permit of NIOC is the main concern of establishment of new LPG condensate facilities with following specification:

  • Feed Source of Supply: Assaluyeh region in South Pars gas field of overseas country.
  • Transport facility: Pipe line
  • Intake/Off take facilities: Assaluyeh facilities including loading/unloading
  • Main Product: Kerosene, gasoline, gasoil, jet fuel, naphta
  • Capacity: 120,000 BBLD.
  • Feed Specification: LPG condensate from South Pars gas field

ANEDCO Scope of Work:

  1. Pre-Feasibility Study
  2. Managing Contracting including coordination of access road study, Environmental Impact Assessment, Water, environmental, and climate conditions, geotechnical study, earthquake study, geology, surveying,
  3. HSE
  4. Feasibility Study
  5. License
  6. Basic Engineering Design
  7. Detail Engineering including: Detail Procurement, Delivery to site.
  8. Construction
  9. Pre-Commissioning
  10. Start-Up
  11. Operation including: Market, Laboratory, Mechanical, Process, Inspector, Production, Planning, Administration
  12. Whole Basic and Detail Engineering Design (in separated contracts)
  13. MR Preparation
  14. Vendor Documents Checking
  15. Site Supervision